Reduced levels of grid points marked and contour lines are drawn by interpolion. Then grid square is plotted on the drawing sheet. Levels of all grid points are established by levelling. Commonly used size of square varies from 5 m Ã- 5 m toĢ0 m Ã- 20 m. Method of Squares: In this method area is divided into a number of squares and all grid points are marked (Ref. After locating the points on the plan, reduced levels are marked and contour lines are interpolated between the selected points.įor selecting points anyone of the following methods may be used: Thus in this method horizontal control is established first and then the levels of those points found. In this method, levels are taken at some selected points and their levels are reduced. This method is slow, tedious but accurate. For getting speed in levelling some times hand level and Abney levels are also used. It is better if both are nearby so as to communicate easily. The level and survey instrument need not be shifted at the same time. After required points are established from the instrument setting, the instrument is shifted to another point to cover more area. Plane table survey is ideally suited for this work. Thus several points are established on a contour line on one or two contour lines and suitably noted down. It is followed by establishing horizontal control. After that instrument man directs the staff man to another point where the same staff reading can be found. A surveyor establishes the horizontal control of that point using his instruments. The instrument man asks staff man to move up and down in the area till the required staff reading is found. The plane of collimation/height of instrument is found and the required staff reading for a contour line is calculated. A level is set on a commanding position in the area after taking fly levels from the nearby bench mark. It consists in finding vertical and horizontal controls of the points which lie on the selected contour line.įor vertical control levelling instrument is commonly used. However, broadly speaking there are two methods of surveying: Based on the instruments used one can classify the contouring in different groups. If the theodolite is used both horizontal and vertical controls can be achieved from the same instrument. To exercise vertical control levelling work is carried out and simultaneously to exercise horizontal control chain survey or compass survey or plane table survey is to be carried out. Contouring needs the determination of elevation of various points on the ground and at the same the horizontal positions of those points should be fixed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |